Projects
100m of 900mm liner installed in culvert
A culvert needed replacement and with limited entry on to the easements, and steep ravines involved, Mar-tech rose to the challenge.
Erecting special scaffolding and using a crane to stage the wetted liner, the crew installed the liner in one day and did the clean up the next.
Because of the environmental concerns the use of process water was kept to a minimum and air/steam was used for inversion and curing.
40 Photos
